On Monday the property was mowed and trimmed. The retention area wasn’t mowed this week since it hadn’t grown much since last mow. All beds were sprayed for weeds as well. We are still on a bi-weekly schedule for maintenance for another week or two.
Met with the Landscape Committee on Wednesday and reviewed the status of the grounds in general, the bushes and trees along the fence line, and discussed some ideas for the areas the owners have asked to be able to plant to the left and right of their front doors as well as the islands. Walked the property as well.
Thursday David walked the property with Bob and the Irrigation company to check all zones, watering times, and coverage. Had 2 controllers fail and were replaced on the spot.
All Palm Trees were also trimmed on Thursday along the fence line. They also pruned the tree along Shreve Street behind the pool Cabana that was leaning and touching the ground. It looks great and is clean around it as well.
Friday Two areas along buildings 11 and 6 were assessed, where owners have noticed the foundation is exposed. Both areas will be sodded in the near future.
Currently there is 1-2 openings for the Landscape Committee if anyone is interested. We are looking to gather together a handful of owners to do a cleanup on the beds; if interested please contact David Bockmann.