Categories
News

Pool & Spa Refurbishing

After the pool and spa were drained, the old ceramic tile was removed and replaced. Any concrete surfaces that were not up to par were chipped away and repairs were made.

On Saturday, a large crew came to resurface both the pool and the spa with a product called “Stonescapes, Aqua cool mini pebble”.

Both the spa and pool have now been refilled with city water. Once chemicals are rebalanced we will obtain permission to reopen.

Pool and spa were opened on Oct 7, 2021.

One reply on “Pool & Spa Refurbishing”

Leave a comment